View Full Version : Fix it: installing a tile floor



DarkSkies
02-05-2009, 08:27 PM
Tile installs are expensive, because a good tile man is worth his weight in gold. There's a guy out there who is a master tile guy. He does the most amazing tile work, catches large, and never brags about it. He taught me a lot about fishin, but for some reason he don't wanna know me anymore. Hey, man if I did somethin to ya personally, I'm sorry, but I do appreciate all the times you took to teach me stuff. :HappyWave: Tight lines.

Back to the tile talk, pics to follow.

1. Prepare your floor. No flex, no flex, no flex! Good prep work is the most important part of any job, don't skimp here. This job will assume you're laying over a plywood base. If there is substantial flex to that base, any old or rotted wood, you may need to replace or sister up/place some cripples underneath the floor, if you have access.

For the most part, this won't happen. You'll run into this mostly in bathrooms that have had water damage for a long time and may have soft areas. One bathroom I had to rip up half the floor by the tub area, sister some 2x6s to the joists because the whole corner of the room sunk a bit, lay new plywood, and then start with the cement board. But that was an extreme case.

If ye got squeaks, now's the time to fixem. Figure out where the joists are, and sink screws into them at varied spots until the squeaks are gone. Sometimes 10 well-placed screws will do the job, sometimes more.


4761

4762

DarkSkies
02-05-2009, 09:21 PM
2. Install your cement board. I like hardibacker, easy to follow the marks, though they bang you on those special screws. Make sure the screw heads are slightly under the surface or flush, no ridges.

4763

DarkSkies
02-05-2009, 09:24 PM
3. Lay down your seam tape and underlayment patch. Someone asked me if it's important to use underlayment patch, why not use mortar mix? The way I was taught was to use underlayment patch and let it set for a couple hours, it's a little more elastic and less subject to cracking. At times in a hurry I have also used the mortar mix with no ill effects to patch the seams.

4764

DarkSkies
02-05-2009, 09:27 PM
4. Mark the center line of the room. I ususally just run a line down the center of the longest side, and use that line as a guide.

Decide what pattern you want. I keep it simple, but my signature is a diamond pattern. Now everyone's doing it, so it's not so unique. However, I like the psychological affect it gives by making the room look different. Compare a room of straight square tiles to one where they were laid diagonally. To me, the diagonal pattern looks best every time. :thumbsup:

Pre-cut and lay your tiles with spacers. Give yourself enough room at the sides in case you need to shift things a bit with the final job. Decide what spacers you want. The trend is bigger spacers nowadays (3/8 - 1/2" for floor tiles). That helps if your lines aren't perfect, but I like them a little on the small side. To me, it looks cleaner and tighter.




4765

4766

4767



diamond pattern requires a little more skill making cuts
4773

4774

DarkSkies
02-05-2009, 09:34 PM
5. Use a good tile saw.The bigger your tiles are, the better your machine should be. Those $80 specials are good when you do one floor, terrible when you start doing larger SF areas and need to get the job done. I used to use 12" tile a lot. Now 16" is the popular size, unless you're talking about a small SF bathroom. Replace the blade when it gets dull, constant water flow helps blade to last longer.


4768

DarkSkies
02-05-2009, 09:39 PM
6. Once you're happy with the floor setup, mix your mortar mix thoroughly, no lumps or dry spots. I use a universal mixer, attached ot my Dewalt drill. Always add mix to the water, don't use too much water at a time. If it's too runny it won't set up right, follow instructions.

Use a poly or fortified mix for high traffic areas, bathrooms, and hallways. You might want to use a harder grade of tile, such as porcelain, for hallways or landings too.

4769

DarkSkies
02-05-2009, 09:41 PM
7. Spread it out using a trowel with the right sized notches, bigger ones for floor tiles, smaller notches for wall and smaller tiles. If it's real humid or hot out, I throw some water on the hardibacker first.

DarkSkies
02-05-2009, 09:45 PM
8. Start in the furthest area and work your way so you have an exit, kinda like when you paint a floor. :D go over all work after you lay it down. Make sure all spacers are set up correctly, and re-check all lines for straightness as the mortar mix sets up.

Remove any excess mortar mix from the lines between, you will be putting grout here.

I usually like to set up the mortar mix towards the end of the day, double check everything, leave the job, and come back the next morning to check and grout.


4770

4771

DarkSkies
02-05-2009, 09:51 PM
9. Grout - I like darker colors to hide the dirt, currently using sandstone for most floor installs, and kitchen tile backsplash jobs. Mix the grout like you did the mortar mix, no lumps, allow it some time to set.

Then apply using a rubber squeegee trowel, running the rubber edges along the tile to remove the excess. Don't make your grout too watery or it may crack as it sets up and the water evaporates. Good consistency is where you can move it through your hands like play dough, but is doesn't "drip" through your fingers.

after grout
4772

DarkSkies
02-05-2009, 09:54 PM
10. A few hours after you lay the grout down, sponge it off the tile areas with a decent sponge and bucket of warm water, smoothing the grout lines as you go.

Not enough time, and the grout will peel off with the sponge. Wait a little linger. Too much time, and you'll be :embarassed: at how hard you have to work to get it off. Follloing instructions is good, but over time you get a sense of when it's set up right and you can start sponging it.

DarkSkies
02-05-2009, 09:56 PM
11. Clean all your tools and equipment the day you do the job, no matter how tired you are. The other night, I went back to the job, and was cleaning stuff till 12:30 am because it had to be done. Leave it till the next morning and it will be twice as hard to clean.

DarkSkies
02-05-2009, 09:58 PM
12. Once your job is done, place your saved molding carefully around the perimeter, and gently hammer it back. On a kitchen job, you might want to splurge on new molding, depending on the shape of the old. It's only 1/4 round anyway, not too expensive. Caulk any gaps, paint.

Stand back and admire your work. :clapping: :D