I talked to the Shrewsbury dredge foreman earlier this week. He told me they were dredging the shoals in the river, from Sea Bright to the Oceanic Bridge. I think he said they would be depositing the dredge material back by that island, not exactly sure. Something about his contract limited to 3000 Cu yards.

As for the Monmouth Beach restoration Cowherder and Vpass, I tried to get confirmation if the dredge material from the river would be pumped over there, and got conflicting statements.

There is a huge restoration project going on now in Monmouth Beach. * I may incorporate that and some pics I took in this thread or start another thread. I'm seeing jetties in MB and Sea Bright that were covered in sand for years and are now visible and fishable. It's kind of cool, more structure, but we still have that pesky shallow water sandbar extending down most of the beach to contend with. It will be interesting to see how they put it back together.

Right now I'm trying to fish it every chance I get and learn all the MoCo beach areas all over again.